DMAIC (Define, Measure, Analyze, Improve, Control) described as….
D – Define the goals of the improvement activity.
M – Measure the existing system.
A – Analyze the system to identify ways to eliminate the gaps between the current performance of the system or process and the desired goal.
I – Improve the system.
C – Control the new system.